On Air Now Club Classics 7:00pm - 2:00am Email
Now Playing STAYIN' ALIVE BEE GEES, N TRANCE Download

    Contracts Signed Allowing Repair Works To Commence At Cliff Walk In Bray

    Contracts have been signed for works to be carried out on the Bray side of the Cliff Walk to stabilize overhead rocks that are at risk of falling onto the walk.

    The Cliff Walk was completely closed to the public at the end of October last year following a substantial rock fall.

    Officials from Wicklow County Council are engaged in a process of acquiring land to move the walk away for the section affected by the landslide in 2021.

    More from East Coast FM Wicklow News

    Later...

    Co Wicklow Weather

    • Bray

      Sunny intervals

      High: 16°C | Low: 7°C

    • Wicklow

      Sunny intervals

      High: 16°C | Low: 7°C

    • Arklow

      Sunny intervals

      High: 16°C | Low: 5°C

    • Blessington

      Sunny intervals

      High: 16°C | Low: 5°C

    • Baltinglass

      Sunny intervals

      High: 18°C | Low: 5°C

    Listen Live Listen